Installation GuidePoleVault IP SystemsPoleVault SystemFeaturing the PVS 305SA IP Switcher68-1920-01 Rev. B06 13ALSO AVAILABLE:The PoleVault® SystemIn
Inventory Included ItemsThe PoleVault IP System (featuring the PVS 305SA IP switcher) ships in one box. The box (80-xxx-13) contains the devices, har
PoleVault IP System80-200-13 (or 80-300-13*, 80-400-13*)MLC 104 IP Plus White60-818-03MLC 104 IP PlusPVS 305SA IP60-986-01NPVS 305SA IPPoleVault IP Sw
• Dry wall saw and hacksaw blade mounted on handle (for cutting ceiling tiles)• Flashlight and safety goggles• Razor knife• 2 inch hole saw• Pain
Installation OverviewThis overview outlines the basic steps for installing the PoleVault IP System. An outline and checklist of the stages (Stages One
Outline of Installation StepsStage 1 — Install the Screen and Projectorc Mark the screen location (page 12).c Install projector to verify location (
PCM 340 Projector Drop Ceiling Mount a • Where it goes: Attaches to a structural ceiling, rests on the suspended ceiling.• What it does: Holds the s
1. — Mark Screen LocationTIPS:• When marking the location of screens, devices, or the site for installing transmitters and MediaLink control devices,
ï Screw the adjuster plate onto the base of the pipe. d. Using a 3/32 inch hex wrench, back out the set screws on the top portion of the adjuster pl
Using the slot closest to the barrel, secure thearms to the bracket withthe clamp and screw.vi. Pivot the arms so that they extend towards the center
ix. Check for stress on the arms. To do this loosen the mounting screws (do not remove). If the arm or the barrel lifts, this indicates stress on the
Safety Instructions • EnglishWARNING: This symbol, , when used on the product, is intended to alert the user of the presence of uninsulated dangerou
à Mark the structural ceiling for lag eye bolt installation.4.— Cut the Ceiling Tilea. Mark the location of the PCM 340 on the T-frame. This aids p
6.— Finish Projector Drop Ceiling Mount Installationa. Detach the projector bracket and projector from the adjuster plate. DO NOT remove the projecto
å Attach the turnbuckles at the corners of the PCM 340.7. — Secure the Projector Drop Ceiling Mount to the Ceilinga. Attach the four turnbuck
8. — Install the Electrical Box (if required)WARNING: Improper installation may result in electrical shock or serious injury. All electrical installa
PoleVault IP Systems • Installation — Stage 1 (Screen and Projector)20
COMPUTER INAUDIOIN OUTMONITOR OUTIR OUTS GAudio and VideoOutput Port (at rear)PVT CV D AUDIO INLRVIDEO INIR OUTS GDecoraFaceplateMountingScrews (2
CONFIGDISPLAYVOLUMEMLC 104 IP PLUSONVCRDVDPCOFF1234Mountingscrews (4)123GROUND+12V OUTCMGROUNDIR OUTGROUNDSCPGROUNDTxRxDISPLAYRS-232/IRA B C D
NOTE: The installation must conform to national and local building and electrical codes, and UL requirements. See the device user guides for details.
2. — Pull the Cables (at the input locations)The following cables need to be installed:• CAT 5 cables for signal transmission from the AV wall plates
3. — Install Wall Platesa. Connect the CAT 5 cables to the rear of the input devices (for RGB devices, connect cable labeled A to port A and cable B
FCC Class B Notice This equipment has been tested and found to comply with the limits for a ClassB digital device, pursuant to part15
4. — Install MediaLink ControllerTIP: Before cabling and installing the MLC 104 IP Plus, locate and write down the MAC address of the device for confi
b. Connect the IR/RS-232 projector communication cable as shown for either RS-232 or IR projector controlNOTE: Some projectors require NULL connecti
d. The connections between the MLC 104 IP Plus and the PVS 305SA IP switcher should look like the figure at right.e. Sliding the cables into the ope
Stage 3: Installing the FF 120 Ceiling SpeakersStage 3 Involves Installing the Devices Shown Below.• Where it goes: Installs in ceiling tiles at pred
NOTE: The installation must conform to national and local electrical codes, and UL requirements. See the device guide for details.1.— Cut Ceiling Til
f. Replace the ceiling tile.Repeat steps 1 and 2 for each speaker that needs to be installed, connecting the speakers according to the system preferr
3. — Terminate the Speaker Cable for the PVS Switchera. To terminate the cable, strip the end of the cable 0.2 inch (5 mm) and secure the wires into
Stage 4: Installing the PMK 550 and the PVS 305SA IPStage 4 Involves Installing the Devices Shown Below.LRLRLRAUX AUDIOINPUT 5LINE OUTVOICELIFTRECEIVE
NOTES: • The installation must conform to national and local building and electrical codes, and UL requirements. See the device user guide for detail
2. — Pull the Cables (at the Switcher location)a. Gather all the cables from the speakers, AV wall plates, MLC 104 IP Plus controller, and any instal
Conventions Used in this GuideNotificationsThe following notifications are used in this guide:DANGER: A danger indicates a situation that will result
3. — Finish installing the Pole Mount KitCAUTION: The PoleVault signal transmission method is specific for PVS 305SA IP switchers working with PVT wa
The MLS Conguration Utility software û Launch the MLS Conguration program ü Select “Help, Contents” and follow instructionsStage 5: Configuring the
2. — Configure the System — Global Configuratora. Download and install Extron’s Global Configurator (GC) configuration program (available at www.extron
3. — Test the Systema. Connect all the input devices (PC, DVD, document camera, and where desired LAN cables, and so forth) to the transmitters and p
d. Test the controller configuration as follows:• Check that the MLC is controlling the projector and PVS 305SA IP switcher, and outputs the correct
Ü Slide the covers onto the PMK 550.4.— Final Installationa. Slide the covers of the PMK 550 onto the base plate, ensuring the power cable can exit
EDID Minder The PVT RGB D IP Plus (EDID) and the PVT RGB D (EDID) incorporates EDID Minder, which allows the transmitter to communicate the appropriat
Using Learn Mode (Available on PVT RGB D Plus only) 1. Disconnect any sources from the front panel and remove the wallplate from the wall.2. On the
b Attach the Z bracket to the ceiling tile and the back plate. g Align the arrows on the housing rim and the dome tab.ArrowReceiverDomeTwis
Open the Page SensorCeiling Mounted Paging SpeakerPriorityPageSensorStrip plenum jacket fromspeaker cable to revealtwo speaker wires.Speaker Cable wit
IntroductionOverviewThis guide covers the installation of the Extron PoleVault IP System in a drop ceiling room with a wood or concrete structural cei
5. Close and latch the top of the Priority Page Sensor. Reconnect the speaker cable to the speaker.6. Strip 3/16 inches of insulation from each cond
Extron WarrantyExtron Electronics warrants this product against defects in materials and workmanship for a period of three years from the date of purc
Extron Headquarters+1.800.633.9876 (Inside USA/Canada Only)Extron USA - West Extron USA - East +1.714.491.1500 +1.919.850.1000 +1.714.491.1517 FAX +
PVS 305SAPOLEVAULT SWITCHERINPUT SELECTION12PEAKNORMALSIGNALCONFIG3 45AUX AUDIOAUDIO LEVEL ADJUSTPAGINGSENSORSENSITIVITYVOICELIFTMICPEAKNORMALSIGNALIN
Before You Begin — Planning the InstallationBefore installation is started, you must be consider several major factors to ensure that the installation
• Ceiling and wall type (important in assessing the hardware needed)• Ceiling type: dropped, spline, hard lid and similar. Structural type (wood, co
c. Location of MediaLink® Controller and Wall Plates• Forward and side reach (for full details refer to a copy of ADA Standards for Accessible Design
Comments to this Manuals