Extron electronics VoiceLift Operations Instructions Page 48

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 47
Installing and Mounting the Receiver, cont’d
VoiceLift
Microphone • Installing and Mounting the Receiver
5-4
PRELIMINARY
VLC 102 Charging Station
VLP 102 pendant microphone (additional)
The following diagrams show examples of some possible secondary receiver
placements and the resulting coverage:
Receiver and one secondary
receiver in an odd-shaped room
Receiver and one secondary receiver
in a long room
Receiver and three secondary receivers
in a large room, or a room with dark
walls, obstructions, and/or windows
Installation Overview
The installation procedures are outlined in this section. For detailed descriptions
and illustrations of these procedures, refer to the VoiceLift Microphone Installation
Guide.
Stage 1: Installing the receiver base and housing
Installing in a drop ceiling
1. Cut a 2" to 3" hole in the ceiling tile in which the receiver will be mounted.
2. Align the center of the receiver housing with the hole in the ceiling tile.
3. If needed, attach a conduit to the receiver back plate.
N
Observe all local and national building and safety codes to ensure that the
installation meets all regulatory codes.
4. Attach the Z-bracket to the end of the screw on the back side of the ceiling tile.
Replace the ceiling tile.
5. Set the Mix DIP switch to Off and the Tone DIP switch to On (VLR 102
primary receiver only).
Page view 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 63 64

Comments to this Manuals

No comments